You don't have javascript enabled. Good luck with that.
Pencarian
 Progres Pengerjaan Pengerukan Saluran Jalan Kali Pasir Capai 50 Persen

Channel Dredging on Jalan Kali Pasir Has Touched 50 Percent

Hopefully it can minimize inundation optimally when it rains

The Menteng Sub-district Water Resources (SDA) Executing Unit, Central Jakarta reports the water channel dredging on Jalan Kali Pasir, RW 08, Cikini Urban Village has touched 50 percent.

"This work that has been carried out since November 7 aims to minimize inundation," he expressed Menteng Sub-district SDA Executing Unit Head, Yopi Siregar, Monday (11/18).

Channel on Jalan Petojo Barat Normalized

It will be dredged up to 20 meters length in conjunction with the installation of the channel's manhole cover.

"The process has reached 10 meters and is targeted to be complete next week," he explained.

In addition, his side picked up 2 cubic meters of mud and waste from the channel.

"To do it, we have eight personnel in the field. Hopefully it can minimize inundation optimally when it rains," he stated.

Linked News
Popular News indeks
  1. Suckermouth Catfish Control for Environmental Preservation

    access_time18-04-2026 remove_red_eye784 personFakhrizal Fakhri
  2. Jakarta Regional Budget Spending Reaches Rp10.38 Trillion in Q1

    access_time17-04-2026 remove_red_eye713 personDessy Suciati
  3. Suckerfish Handling in South Jakarta is Run in Accordance with MUI Recommendations

    access_time21-04-2026 remove_red_eye622 personTiyo Surya Sakti
  4. Job Absorption Rises in Jakarta

    access_time17-04-2026 remove_red_eye615 personDessy Suciati
  5. Training and Certification Boost Tourism Workforce Competitiveness

    access_time17-04-2026 remove_red_eye596 personAldi Geri Lumban Tobing